High school · Entrepreneurship
Build an Honest Unit-Cost Model
Classify costs within a stated operating range, calculate contribution margin including labor, and reconcile revenue with modeled profit.
One selected lesson · Temporary, ungraded practice
Learn
Reading 1 of 3
Classify the behavior, not the name
A fixed cost stays the same as volume changes within a stated period and operating range. A variable cost changes with the number of units produced or delivered. The same category can behave differently under different arrangements: a flat monthly design fee is fixed, while a fee for each design is variable. State the unit and period before classifying costs. A capacity increase can introduce a new fixed cost, so a model valid for twenty orders may not remain valid for fifty.